Küchenlösungen aus einer Hand

On-Site Installation and Technical Support for the BMP Project in Ethiopia

Post on Nov 25, 2026

For a remote, multi-location commercial kitchen project, equipment delivery is only one part of the process. The kitchens must also be installed, tested, and prepared for daily operation. To support the BMP project in Ethiopia, Chefmax provided on-site installation guidance, commissioning, troubleshooting, and operational support across multiple project locations from Oct 23 to Nov 4, 2026.

Why On-Site Technical Support Was Needed

The Bale Mountains National Park (BMP) project includes restaurants, bars, back-of-house facilities, and tented camps spread across a remote mountainous area. The distance between locations, together with limited access to local commercial kitchen technicians, made on-site technical support an important part of the project.

Once equipment arrived, actual construction conditions, access routes, utility connections, and equipment availability all had to be checked before installation and commissioning could move forward. Chefmax’s technical visit was arranged to help the project team assess these conditions and address issues directly on site.

Commercial Kitchen Solutions
BMP kitchen
restaurant kitchen equipment

Chefmax Team on Site: Installation and Commissioning

The team’s first task was to check the gewerbliche Küchenausstattung delivered to each location against the project equipment list. This helped establish what had arrived, identify any shortages or damage, and determine which kitchens were ready for installation.

Another challenge was the lack of professional equipment-handling experience among some local workers. Without specialized training, equipment was sometimes handled roughly during loading, unloading, and movement, increasing the risk of damage. Chefmax’s technical team therefore had to provide hands-on guidance on proper handling, positioning, and installation procedures while coordinating with the local workforce.

Working alongside local workers, the technical team supported equipment handling, lifting, positioning, and layout. Where water and electrical connections were available, the team assisted with equipment connections and individual testing. This step-by-step approach helped identify which locations could proceed with commissioning and which still needed site preparation.

Kitchen Equipment Handling
Commercial Kitchen Project Support

Adapting Installation to Actual Site Conditions

During the site visit, the team found that some installation conditions differed from the original plans. Certain access openings were narrower than expected, while walls and structural conditions affected planned equipment positions. Some locations also lacked completed drainage or electrical outlets.

The technical team checked each affected area, recorded the conditions with photographs, and communicated the required construction or utility adjustments to the project team. Where structural or utility changes were needed, the proposed adjustments were documented and confirmed before work continued.

Resolving Equipment and Technical Issues

The inspection identified approximately 80 missing equipment items and components across the project locations. The team reviewed equipment availability between sites to identify items that could be redistributed, while recording the remaining shortages for replenishment.

Some equipment had also been damaged during transportation or local handling. The team documented the affected items, assessed their condition, and carried out immediate repairs where possible. Testing also revealed issues such as incomplete electrical connections, abnormal performance, and damaged components. Issues that could not be resolved on site were recorded for follow-up.

Kitchen Technical Inspection
Commercial Kitchen Technical Support

Working Around Incomplete Utility Connections

Not every kitchen was ready for full commissioning when the technical team arrived. At some locations, water or electrical connections had not yet been completed, making full equipment testing impossible.

To keep the work moving, the team completed the equipment inspection and positioning that could be done, recorded the outstanding utility requirements, and clarified what needed to be completed before commissioning could continue. This helped define the next steps between equipment installation and the remaining construction work.

Providing Equipment Guidance to the Operating Team

On-Site Commercial Kitchen Equipment Inspection
Commercial Kitchen Equipment Installation in Ethiopia

Installation is only one part of preparing a commercial kitchen for operation. The people using the equipment also need to understand its basic operating and maintenance requirements.

During the visit, Chefmax provided on-site technical support and equipment operation guidance to the culinary team, covering essential procedures such as daily operation, temperature control, cleaning, and safety. This helped the operating team become more familiar with the equipment before moving into regular kitchen operations.

On-Site Work Completed and Follow-Up Requirements

By the end of the technical service visit, the team had inspected and positioned equipment across the relevant locations, completed the installation and commissioning work that site conditions allowed, and documented the outstanding issues.

Some facilities were close to operational readiness, while others still depended on equipment replenishment, site rectification, or the completion of utility connections. The inspection records and follow-up requirements gave the project team a clearer basis for coordinating the remaining work.

Supporting the BMP Project Beyond Equipment Delivery

Chefmax Team in Ethiopia
Commercial Kitchen Project in Ethiopia

The BMP project reflects Chefmax’s ability to handle complex commercial kitchen projects and respond flexibly to unexpected challenges. With practical experience, professional technical knowledge, and a problem-solving approach, we work closely with project teams to find solutions and keep projects moving forward, even in challenging conditions.

Every project brings its own challenges, and each experience helps us deliver better solutions. The BMP project is another step in Chefmax’s journey of supporting commercial kitchen projects worldwide.

Explore More Project Videos: https://www.youtube.com/watch?v=uEkf-xcx34U

Have a commercial kitchen project in mind? Get in touch with Chefmax and let’s explore how we can bring it to life.

Vielen Dank für Ihr Interesse an unseren Produkten